色欲色欲天天天www亚洲伊 I 国产av综合影院 I 91午夜在线观看 I 男人都懂得网址 I 天天久久av I 内射巨臀欧美在线视频 I ysl蜜桃色7v I 六月激情网 I 国产人成看黄久久久久久久久 I 黄色a网站 I 国产黑色丝袜视频在线观看网红 I 欧美做受高潮中文字幕 I 国产精品普通话 I 91免费激情视频 I 日韩一级片免费 I 久久久国产乱子伦精品 I 欧美阿v天堂 I 日日摸日日碰人妻无码 I 亚洲国产精品一区二区成人片国内 I 97国产成人 I 日韩在线小视频 I 特级淫片aaaaaaa级 I 黄色免费片 I 国产免费激情视频 I 精品国精品国产自在久国产应用男 I 日韩在线 I 亚洲精品aaa I 欧美性色黄大片a级毛片视频 I av天堂午夜精品一区 I 亚洲精品1区2区 I 国产一女三男3p免费视频 I 2019国产精品自在线拍国产不卡 I 国内精品第一页 I 国产色哟哟在线观看 I 2021精品视频

POSITION:HOME > QUESTION

QUESTION

Brazed plate heat exchanger process requirements

1) pickling temperature: increasing the pickling temperature is conducive to improve the descaling effect, if the temperature is too high, it will aggravate the corrosion of the acid washing plate on the heat exchanger plate, through repeated tests, acid The washing temperature is preferably controlled at 60 °C.
2) pickling solution concentration: According to repeated trials, the acid washing solution should be prepared according to the concentration of formic acid 81.0%, water 17.0%, buffer 1.2%, surfactant 0.8%, cleaning effect it is good.
3) pickling method and time: pickling method should be combined with static soaking and dynamic cycling. The pickling time is first static soaking for 2 h, then dynamic cycling for 3-4 h. The pickling concentration should be sampled frequently during the pickling process. When the difference between the two adjacent assays is less than 0.2%, the pickling reaction is considered to be complete.
4) passivation treatment: after the end of pickling, the scale and metal oxide on the surface of the plate heat exchanger are mostly dissolved and detached, exposed to new metal, easy to corrode, so pickled After that, the heat exchanger sheets are passivated.
2019/05/11 09:27:26 5045 Click